Calculate exact solar system size, subsidy amount, monthly savings, and payback period using real 2026 state irradiance data. Covers all 22 major states.
PM Surya Ghar Subsidy Included • 2026 Rates
Check your last 3 months' average
~100 sq. ft needed per kW
Higher efficiency, ideal for smaller roofs
India gets 300+ sunny days/year. Even moderate-irradiance states like UP and Punjab average 4.8 kWh/m²/day of solar energy — enough for 4–6 year payback.
Grid-tied systems let you sell surplus power to the DISCOM grid. Your smart meter tracks credits monthly. Most states now mandate Net Metering under CERC 2023 regulations.
A properly-sized rooftop solar system can offset 80–100% of your electricity bill within 3–5 years after the PM Surya Ghar subsidy. Panels last 25+ years with minimal degradation.
Not ready for full rooftop? Start with these kits. Build up your solar journey step by step.
For Balconies, Camping & Off-Grid Use
Plug-and-play portable panels. No installation needed — ideal for renters and balcony users.
Luminous, Microtek & Amaze — 2026 Models
Grid-tied & off-grid solar inverters with MPPT charge controllers. Compatible with all rooftop systems.
No Wiring Needed — Plug in Sunlight
Solar-powered motion sensor lights, garden lamps and security lights. Zero electricity cost.
Affiliate disclosure: DesiUtility may earn a small commission on qualifying Amazon.in purchases. This does not affect product recommendations.
Step-by-step process for PM Surya Ghar Muft Bijli Yojana. Solar Subsidy Registration takes less than 30 minutes online.
You must be a residential electricity consumer with a valid DISCOM consumer number. The property must be owned (not rented). Maximum system size: 10 kW per household.
Visit pmsuryaghar.gov.in. Register using your state, DISCOM, consumer number, and Aadhaar-linked mobile. Application is 100% free and paperless.
Your DISCOM will send a field officer to inspect your roof and approve the system size. This usually takes 5-10 working days. Net Metering registration is done simultaneously.
Select only vendors from the MNRE empanelled vendor list. Using unapproved installers will disqualify you from the subsidy. Get 3 quotes before finalising.
Installation typically takes 1-3 days. After commissioning, DISCOM installs a bi-directional smart meter for net metering. Post-installation inspection is mandatory.
Submit commissioning certificate + bank details on the portal. The subsidy amount is directly transferred to your bank account within 30 days. No middlemen involved.
Official Registration Portal: pmsuryaghar.gov.in
Helpline: 1800-180-3333 (Toll Free) | Available Mon–Sat, 9 AM – 6 PM. MNRE-Approved Vendor list is available on the official portal by state.
The average 3 kW PM Surya Ghar installation reaches financial break-even in 2.6 years after the ₹78,000 subsidy. 25-year net return: ₹7.3 lakh at a 2% annual tariff escalation rate.
Assumes 5.5 peak sun hours/day · 25-year panel warranty · ₹8/unit current blended tariff.
Which panel is best for high-heat states like Rajasthan? Here's the full Eco-Expert breakdown.
High-heat states need panels with lower thermal degradation. Monocrystalline panels lose only 0.3%/°C vs 0.4%/°C for poly — that's 8–12% more power output in peak summer. The higher upfront cost is offset within 2 years.
If you have 500+ sq. ft of roof space and want to maximise kW per rupee, polycrystalline gives 15–20% cost savings. Ideal for commercial premises in moderate-climate states like West Bengal, Kerala, or Assam.
Expert answers to your solar questions — no jargon.
Yes, solar panels generate electricity from light, not heat. On overcast or rainy days, efficiency drops by 25–30%, but panels continue to produce power. Coastal states like Goa and Kerala with 4–5 rainy months still achieve 7–8 year payback periods.