Desi Utility
Calculate My Subsidy Free
Karnataka — PM Surya Ghar 2025

PM Surya Ghar Subsidy Calculator for Karnataka

Calculate your exact central + state solar subsidy, net installation cost, and payback period for Karnataka. Pre-filled with Karnataka's DISCOM rates and solar data.

DISCOM
BESCOM / MESCOM / CESC
Avg Tariff
₹6.5/kWh
Sun Hours
5.5 hrs/day
Solar Potential
Good
3 kW System Estimate for Karnataka
Gross installation cost₹1,95,000
Central subsidy (PM Surya Ghar)−₹78,000
Your net cost₹117,000
Est. monthly generation~396 kWh
Annual savings₹25,200
Free Calculator

Calculate Your PM Surya Ghar Subsidy

Enter your details below — results are instant and accurate

System Details

1 kW5 kW10 kW
Subsidy tier: ₹60,000 + ₹18,000 for extra kW (Tier 2)
State avg. tariff:6.5/kWh
Avg. daily sun hours:5.5 hrs/day
Est. monthly generation:~396 kWh

Cost & Bill Details

Market range: ₹50,000–₹75,000/kW incl. installation

Higher bill = faster payback from solar savings

Quick Estimate Preview
Gross system cost:195,000
Central subsidy:−₹78,000
Approx net cost:117,000
Karnataka Solar Guide

Complete Solar Installation Guide for Karnataka

State-specific DISCOM policies, net metering rules, application tips, and vendor advice — everything you need before going solar in Karnataka.

Net Metering Policy — Karnataka

DISCOM: BESCOM (Bengaluru) / MESCOM / HESCOM / GESCOM / CESC

Karnataka has one of India's most mature net metering frameworks under KERC. Monthly settlement with annual true-up. Karnataka Renewable Energy Development Ltd. (KREDL) coordinates state solar policy alongside DISCOMs.

Buy-Back Rate
₹3.50/kWh (KERC regulated)
Processing Time
30–60 days
Calculate Net Metering Earnings

Application Tips for Karnataka

1

BESCOM covers Bengaluru and surrounding districts. Apply at bescom.org alongside the national portal.

2

Karnataka's 5.5 sun hours and active MNRE vendor ecosystem make it ideal for solar adoption.

3

KREDL maintains a separate state vendor empanelment list — cross-reference with MNRE list.

4

Bengaluru apartment dwellers should check with their apartment association before applying — many Bengaluru societies are already solar-ready.

Key Insight for Karnataka

Karnataka is one of India's top 3 states for rooftop solar adoption. BESCOM has streamlined the approval process significantly since 2022.

Vendor Selection Advice

Karnataka (especially Bengaluru) has India's most competitive solar vendor market — compare at least 5 quotes. Inverter brand and warranty terms often vary significantly.

View MNRE Empanelled Vendors

Best Cities in Karnataka for Solar

BengaluruMysuruMangaluruHubliBelagaviTumakuru
Application Steps
1
Apply at pmsuryaghar.gov.in
2
Get DISCOM feasibility OK
3
Choose MNRE-empanelled vendor
4
Installation + inspection
5
Subsidy in ~30 days
Apply Now — pmsuryaghar.gov.in

Common Questions for Karnataka Solar Installation

Who is my DISCOM in Karnataka?
BESCOM (Bengaluru) / MESCOM / HESCOM / GESCOM / CESC
What is the net metering buy-back rate?
₹3.50/kWh (KERC regulated)
How long does approval take?
30–60 days
Where do I check empanelled vendors?
pmsuryaghar.gov.in → Empanelled Vendors tab
Expert Answers

Frequently Asked Questions

Everything you need to know about PM Surya Ghar subsidy, installation, and net metering

PM Surya Ghar Muft Bijli Yojana is a central government scheme launched in February 2024 with a ₹75,021 crore budget. It targets 1 crore Indian households to install rooftop solar systems. Eligibility: any residential electricity consumer with a valid connection, own/leased property with suitable roof space (~10 sq.m per kW), and structural load capacity. Government employees are eligible; commercial establishments are not under this specific scheme.

Calculation Methodology & Data Sources

Subsidy Calculation
Central subsidy tiers sourced directly from MNRE gazette notification dated Feb 2024 and updated policy circulars.
State Electricity Rates
Average residential tariff rates for each state from respective DISCOM published tariff orders (FY 2026–27 data).
Solar Generation Estimate
Monthly generation = System kW × State sun hours × 30 days × 0.8 performance ratio (industry standard for rooftop).
Payback Calculation
Net cost ÷ Annual savings from bill offset. Does not include potential net metering export credit (which improves payback further).
CO₂ Avoided
Uses India CEA grid emission factor of 0.71 kg CO₂ per kWh for 2023–24, as per latest published grid emission factor.

Official Sources Referenced

Editorial Policy

Desi Utility's solar calculators are reviewed quarterly against MNRE notifications and state DISCOM tariff orders. We do not receive any commission from solar vendors listed on this page. Subsidy figures are verified against official gazette notifications.

Read our full editorial guidelines →
Last Updated: March 2026
This calculator is updated when MNRE issues revised subsidy circulars or when state DISCOMs revise tariffs. Subsidy amounts are as per the latest MNRE guidelines. Always verify final subsidy at pmsuryaghar.gov.in before applying.