Desi Utility
Calculate My Subsidy Free
Uttarakhand — PM Surya Ghar 2025

PM Surya Ghar Subsidy Calculator for Uttarakhand

Calculate your exact central + state solar subsidy, net installation cost, and payback period for Uttarakhand. Pre-filled with Uttarakhand's DISCOM rates and solar data.

DISCOM
UPCL
Avg Tariff
₹5.5/kWh
Sun Hours
5 hrs/day
Solar Potential
Good
3 kW System Estimate for Uttarakhand
Gross installation cost₹1,95,000
Central subsidy (PM Surya Ghar)−₹78,000
Uttarakhand state subsidy−₹15,000
Your net cost₹102,000
Est. monthly generation~360 kWh
Annual savings₹23,760
Uttarakhand residents get extra: ₹15,000 extra via UREDA
Free Calculator

Calculate Your PM Surya Ghar Subsidy

Enter your details below — results are instant and accurate

System Details

1 kW5 kW10 kW
Subsidy tier: ₹60,000 + ₹18,000 for extra kW (Tier 2)
₹15,000 extra via UREDA — Extra savings!
State avg. tariff:5.5/kWh
Avg. daily sun hours:5 hrs/day
Est. monthly generation:~360 kWh

Cost & Bill Details

Market range: ₹50,000–₹75,000/kW incl. installation

Higher bill = faster payback from solar savings

Quick Estimate Preview
Gross system cost:195,000
Central subsidy:−₹78,000
Approx net cost:102,000
Uttarakhand Solar Guide

Complete Solar Installation Guide for Uttarakhand

State-specific DISCOM policies, net metering rules, application tips, and vendor advice — everything you need before going solar in Uttarakhand.

Net Metering Policy — Uttarakhand

DISCOM: UPCL (Uttarakhand Power Corporation Ltd.)

Net metering under UERC regulations. UPCL is the single DISCOM for the entire state — simplified application. Monthly settlement. UREDA (Uttarakhand Renewable Energy Development Agency) coordinates the ₹15,000 additional state subsidy.

Buy-Back Rate
₹3.50/kWh
Processing Time
45–75 days
Calculate Net Metering Earnings

Application Tips for Uttarakhand

1

Apply via pmsuryaghar.gov.in and additionally register with UREDA at ureda.uk.gov.in for the ₹15,000 state subsidy.

2

Uttarakhand's hilly terrain requires specialized installation — south-facing roof tilt, not flat mounting.

3

Dehradun, Haridwar, and Rishikesh in the plains zone get strong solar generation. Hill stations are more variable.

4

At ₹5.5/kWh tariff + ₹15,000 state subsidy, the total ₹93,000 combined subsidy makes Uttarakhand attractive.

Key Insight for Uttarakhand

Uttarakhand's ₹15,000 state subsidy (via UREDA) is one of India's highest state top-ups. Combined with ₹78,000 central = ₹93,000 total — reducing 3 kW net cost to below ₹1,02,000.

Vendor Selection Advice

UREDA maintains a state-empanelled vendor list at ureda.uk.gov.in. For hilly areas, ensure vendors have prior experience with slope installations.

View MNRE Empanelled Vendors

Best Cities in Uttarakhand for Solar

DehradunHaridwarRishikeshHaldwaniRoorkee
Application Steps
1
Apply at pmsuryaghar.gov.in
2
Get DISCOM feasibility OK
3
Choose MNRE-empanelled vendor
4
Installation + inspection
5
Subsidy in ~30 days
Apply Now — pmsuryaghar.gov.in

Common Questions for Uttarakhand Solar Installation

Who is my DISCOM in Uttarakhand?
UPCL (Uttarakhand Power Corporation Ltd.)
What is the net metering buy-back rate?
₹3.50/kWh
How long does approval take?
45–75 days
Where do I check empanelled vendors?
pmsuryaghar.gov.in → Empanelled Vendors tab
Expert Answers

Frequently Asked Questions

Everything you need to know about PM Surya Ghar subsidy, installation, and net metering

PM Surya Ghar Muft Bijli Yojana is a central government scheme launched in February 2024 with a ₹75,021 crore budget. It targets 1 crore Indian households to install rooftop solar systems. Eligibility: any residential electricity consumer with a valid connection, own/leased property with suitable roof space (~10 sq.m per kW), and structural load capacity. Government employees are eligible; commercial establishments are not under this specific scheme.

Calculation Methodology & Data Sources

Subsidy Calculation
Central subsidy tiers sourced directly from MNRE gazette notification dated Feb 2024 and updated policy circulars.
State Electricity Rates
Average residential tariff rates for each state from respective DISCOM published tariff orders (FY 2026–27 data).
Solar Generation Estimate
Monthly generation = System kW × State sun hours × 30 days × 0.8 performance ratio (industry standard for rooftop).
Payback Calculation
Net cost ÷ Annual savings from bill offset. Does not include potential net metering export credit (which improves payback further).
CO₂ Avoided
Uses India CEA grid emission factor of 0.71 kg CO₂ per kWh for 2023–24, as per latest published grid emission factor.

Official Sources Referenced

Editorial Policy

Desi Utility's solar calculators are reviewed quarterly against MNRE notifications and state DISCOM tariff orders. We do not receive any commission from solar vendors listed on this page. Subsidy figures are verified against official gazette notifications.

Read our full editorial guidelines →
Last Updated: March 2026
This calculator is updated when MNRE issues revised subsidy circulars or when state DISCOMs revise tariffs. Subsidy amounts are as per the latest MNRE guidelines. Always verify final subsidy at pmsuryaghar.gov.in before applying.